Performing the remaining mechanical tasks and practical tests

Completion of Pending Tasks

In this second phase, the following remaining activities were completed:

Fixing Materials and Methods

Single Platform Dynamic Load Testing

Photographic Records

Image 1: Holes at the top of the tower for passing wires (top view).

Image 1: Holes at the top of the tower for passing wires (top view).

Image 2: Holes at the top of the tower (bottom perspective).

Image 2: Holes at the top of the tower (bottom perspective).

Image 3: Complete tower

Image 3: Complete tower

Image 4: Electronics case with ventilation holes and cable passage.

Image 4: Electronics case with ventilation holes and cable passage.

Image 5: Bottom of the platform: supports, load cells and non-slip rubbers.

Image 5: Bottom of the platform: supports, load cells and non-slip rubbers.